• Home
  • Our Realizations
    • Discovery Harbour
    • Cabin Cruiser
    • Delta Floating House
    • Inlet Rustler
    • Cabin Cruiser #2
    • Barge
    • Fibre Glass 38
    • Newly Built Aluminum Boat
    • Little Winder
    • Aluminum II
    • Epoxy Garage
    • Tank Farm
    • Aluminum III
    • Albertan Trailer
    • Inlet Tempest
  • More
    • Home
    • Our Realizations
      • Discovery Harbour
      • Cabin Cruiser
      • Delta Floating House
      • Inlet Rustler
      • Cabin Cruiser #2
      • Barge
      • Fibre Glass 38
      • Newly Built Aluminum Boat
      • Little Winder
      • Aluminum II
      • Epoxy Garage
      • Tank Farm
      • Aluminum III
      • Albertan Trailer
      • Inlet Tempest
  • Sign In
  • Create Account

  • Orders
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Orders
  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Our Realizations
    • Discovery Harbour
    • Cabin Cruiser
    • Delta Floating House
    • Inlet Rustler
    • Cabin Cruiser #2
    • Barge
    • Fibre Glass 38
    • Newly Built Aluminum Boat
    • Little Winder
    • Aluminum II
    • Epoxy Garage
    • Tank Farm
    • Aluminum III
    • Albertan Trailer
    • Inlet Tempest

Account

  • Orders
  • My Account
  • Sign out

  • Sign In
  • Orders
  • My Account

Little Winder – Before

Little Winder – Steel Workboat Restoration

Scope of Work:

Complete wet blasting of the steel hull and topside to remove heavy rust and buildup. Applied Intershield 300HS epoxy primer for corrosion protection, followed by Interlux 990 — black on the hull and white on the topside.

The result is a clean, high-build finish with long-lasting marine protection and a fresh, professional look.


Little Winder – After

Copyright © 2025 Pacific versatile solutions inc.  - All Rights Reserved.

Powered by

  • Cabin Cruiser

Announcement

Welcome! Check out my new announcement.

Learn more