• Home
  • Our Realizations
    • Discovery Harbour
    • Cabin Cruiser
    • Delta Floating House
    • Inlet Rustler
    • Cabin Cruiser #2
    • Barge
    • Fibre Glass 38
    • Newly Built Aluminum Boat
    • Little Winder
    • Aluminum II
    • Epoxy Garage
    • Tank Farm
    • Aluminum III
    • Albertan Trailer
    • Inlet Tempest
  • More
    • Home
    • Our Realizations
      • Discovery Harbour
      • Cabin Cruiser
      • Delta Floating House
      • Inlet Rustler
      • Cabin Cruiser #2
      • Barge
      • Fibre Glass 38
      • Newly Built Aluminum Boat
      • Little Winder
      • Aluminum II
      • Epoxy Garage
      • Tank Farm
      • Aluminum III
      • Albertan Trailer
      • Inlet Tempest
  • Sign In
  • Create Account

  • Orders
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Orders
  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Our Realizations
    • Discovery Harbour
    • Cabin Cruiser
    • Delta Floating House
    • Inlet Rustler
    • Cabin Cruiser #2
    • Barge
    • Fibre Glass 38
    • Newly Built Aluminum Boat
    • Little Winder
    • Aluminum II
    • Epoxy Garage
    • Tank Farm
    • Aluminum III
    • Albertan Trailer
    • Inlet Tempest

Account

  • Orders
  • My Account
  • Sign out

  • Sign In
  • Orders
  • My Account

Inlet Tempest – Before

Inlet Tempest – Hull Restoration

Scope of Work:

Complete wet blasting of the steel hull to bare metal, followed by two coats of Intershield 300HS epoxy primer, two coats of Interlux 990, and two coats of Interlux Bottomkote antifouling.

Result: a durable, high-build protective system with a clean, professional finish — and a proud crew ready to ride the boat after completion.

Inlet Tempest – After

Copyright © 2025 Pacific versatile solutions inc.  - All Rights Reserved.

Powered by

  • Cabin Cruiser

Announcement

Welcome! Check out my new announcement.

Learn more